Rebar Quantity per Cubic Metre of Concrete

Back-calculate the total rebar tonnage from concrete volume using a reinforcement ratio (kg/m³). Typical ranges are 80–120 kg/m³ for slabs, 150–250 kg/m³ for beams and 200–350 kg/m³ for columns. Intended for early estimating and material planning.

Disclaimer:Results are produced by deterministic formulas and are intended for quantity estimating and option comparison only. A qualified engineer must verify them against the project specification, design documents and actual site conditions before use. The author accepts no liability for any loss arising from their use.

INPUT

ASSUMPTIONS

RESULT

CALCULATION

    METHOD

    Rebar quantity W = V × ρr, where ρr is the reinforcement ratio in kg/m³. The ratio is an empirical value, so final quantities must be taken off from the reinforcement drawings.

    More in this series

    Related tools

    Engineering Translation

    Working across languages on tenders, specs and technical clauses? EngTranslate gives you domain-trained Chinese ⇄ English translation, a construction & BIM terminology base, and metric–imperial unit handling in one place. EngTranslate →